Environment
Reload (all versions)
Situation
: How to run concurrent (simultaneous) backups. NOTE: This only applies to standard backup jobs. It has no impact on portables and TAR (tape backup) jobs. Answer/
Resolution
In order to run multiple backups at the same time, you need to enable the functionality in Reload. To do this, follow the screen shots below:
Additional Information
This article was originally published in the GWAVA knowledgebase as article ID 1291.