Environment
Reload (all version)
Situation
I want to configure my backup jobs in Reload to run at a time different then the default time. Is there a way to do this?
Resolution
From the "Reload Administration Console" | Profiles | select Post Office or Domain | <select profile> | Standard | Schedule | Configure the Standard Backup Basic Schedule | configure time to run
Additional Information
This article was originally published in the GWAVA knowledgebase as article ID 1562.