Environment
Retain
Situation
Is there a limit to the number of jobs that a single schedule can queue?
Resolution
Yes, the limit is 9 jobs. After the 9th job, the other jobs will error in the Server log as the Retain Server tries to load them.
Additional Information
This article was originally published in the GWAVA knowledgebase as article ID 2692.