Environment
Novell ZENworks 10 Configuration Management with Support Pack 3 - 10.3 Content
Situation
If the clock on a satellite server gets set to some time in the future, once the clock is corrected, it will not replicate new content, until the "future time" is reached (e.g., if the clock was set one day in the future, once the clock is corrected, it will not replicate content for one day)
Resolution
On the satellite server, issue the command
zac cdp replicate
(this works for 10.3.0 onwards), see https://www.novell.com/documentation/zenworks11/zen11_utils/data/bb15p2z.html#bi9c5ji
zac cdp replicate
(this works for 10.3.0 onwards), see https://www.novell.com/documentation/zenworks11/zen11_utils/data/bb15p2z.html#bi9c5ji