Environment
Novell
ZENworks 7.5 Asset Management - ZAM7.5
Situation
WebConsole
-> Asset Management -> Contract Management -> Contract
Status.
1) In the
Contract Status dropdown list "Add a New List Item".
2) Created a
new Status - "Ongoing"
3) Click
Done.
4) Now add
another Status - "Limbo".
5) Click
Done Notice the last Status entry - "Limbo" overwrites the previous
Status - "Ongoing".
Resolution
Fixed in
ZENWorks Asset Management 7.5 Interim Release Interim
3.
The drop
down lists for Type and Status on the Contract General tab
have been replaced with buttons to bring up the popup
list.
Interim
Releases can be scheduled to run automatically or can be downloaded
manually athttps://download.novell.com. The Interim releases
can be set up within the ZAM Manager for the Task server to check
the site on a scheduled basis, and download and apply them
automatically. Please refer to the Help Section for details of how
to set up automatic downloads if desired.Each interim release is
cumulative.
If Interim
Release 3 is not available due to a newer interim release
being placed on the website, be assured that the code needed is in
the later .