Calculated contract fields are blank when using a period

  • 3094273
  • 01-May-2007
  • 27-Apr-2012

Environment

Novell ZENworks 7.5 Asset Management - ZAM7.5

Situation

Fields that are calculated based on start/end dates (Time Remaining, Contract Status, and Annualized financial costs) are blank for locales that use "." as a date separator

Resolution

Fixed in ZENWorks Asset Management Interim Release 2 or newer

Interim Releases can be scheduled to run automatically or can be downloaded manually at
https://download.novell.com. The Interim releases can be set up within the ZAM Manager for the Task server to check the site on a scheduled basis, and download and apply them automatically. Please refer to the Help Section details of how to set up automatic downloads if desired.

Each interim release is cumulative. If Interim Release 2 is not available due to a newer interim release being placed on the website, be assured that the code needed is in the later release.

Status

Reported to Engineering