Problem
happens when doing the following.
WebConsole
-> Asset Management -> Contract Management - View/Edit
Contracts.
1) Add a
Contract Record.
2) On the
SLA tab add a SL Metric.
3) Click on
a Start Date and an End Date.
4) Click"Done".
Return to
the SLA tab. The Date(s) will be reset to blank. This will also
occur when you set the Date Notification checkbox.
Resolution
Fixed in ZENWorks
Asset Management Interim Release 2 or newer
Interim Releases can be scheduled to run automatically or can be downloaded manually athttps://download.novell.com. The Interim releases can be set up within the ZAM Manager for the Task server to check the site on a scheduled basis, and download and apply them automatically. Please refer to the Help Section details of how to set up automatic downloads if desired.
Each interim release is cumulative. If Interim Release 2 is not available due to a newer interim release being placed on the website, be assured that the code needed is in the later release.
Interim Releases can be scheduled to run automatically or can be downloaded manually athttps://download.novell.com. The Interim releases can be set up within the ZAM Manager for the Task server to check the site on a scheduled basis, and download and apply them automatically. Please refer to the Help Section details of how to set up automatic downloads if desired.
Each interim release is cumulative. If Interim Release 2 is not available due to a newer interim release being placed on the website, be assured that the code needed is in the later release.